Here are some detailed steps on how to install a RockTop Floor Waste. If you have any questions, please contact us.
Lay the waterproof membrane over the Flange.
Clip the Membrane Clamp over the wet waterproof membrane and onto the Flange.
COMPLETE WATERPROOFING
Lay tile bed / prepare height setting for laying the floor.
Note: The Protecting cap will prevent construction waste entering the waste pipe whilst making sure the Grate Top is undamaged.